Trademarkia Logo

Australia

AU$
PROMAT
Protected: Registered/protected

Last updated on 4 Jan 2023

Owner Info

Etex Building Performance GmbH

Scheifenkamp 16

40878 Ratingen, GERMANY

Serial Number

2240797 filed on 10 Sept 2021

Correspondent

ETEX Services N.V. - division ETEX IPSC

Kuiermansstraat 1,

B-1880 Kapelle-op-den-Bos,

BELGIUM

PROMAT

Classification Information


Class [009]
Computer software for use in the fields of construction, structural design, civil engineering, modular buildings, architecture, fire safety and insula Read More

Class [017]
Non-metallic seals for use in sealing systems for pipes, joints, cables and ventilation ducts; non-metallic sealants for use in sealing systems for pi Read More

Class [019]
Building materials and components, not of metal; building components, not of metal; non-metallic parts of buildings; building panels, not of metal; ce Read More

Class [037]
Building consultancy; construction; installation services, namely laying of floors, walls, ceilings, cladding and roofs; provision of information rela Read More

Class [041]
Education; providing of training; organization of exhibitions for cultural or educational purposes; arranging and conducting of conferences; distance Read More

Class [042]
Architectural design services; software as a service [SaaS] for use in the fields of construction, structural design, civil engineering, modular build Read More

Mark Details


Serial Number

2240797

Registered On

10 Sept 2021

Renewal On

10 Sept 2031

Mark Type

WORD

Priority Claim (Convention Details)


Date

22 Mar 2021

Mark Type

DE

Legal History


Show more

Status DateAction Taken
4th Jan 2023International Registration in Australia Protected After Adverse (No amendments) correspondence sent
3rd Jan 2023International Registration in Australia Protected After Adverse (No amendments) correspondence sent
3rd Jan 2023IP Right Registration Published
3rd Jan 2023Status change to Registered/Protected
18th Oct 2022Application Accepted correspondence sent
17th Oct 2022Application Accepted correspondence sent
17th Oct 2022IP Right has been Examined
17th Oct 2022IP Right Acceptance Published
17th Oct 2022Status change to Accepted
13th Oct 2022Examination Response Received